KIVANC Reject and Residual Handling for new Paper Mill

As a Key Supplier Meri has provided for Kıvanç Kağıt Üretim – PM 1 (Adana, Turkey) a full WSR Water-Sludge-Reject Subsystem to set the highest Environmental and Sustainability Standards for the operation of the Recycled fiber (OCC) Stock Preparation Plant which delivers up to 1.200 t/day of recycled fiber stock for Testliner, Fluting and  Kraft Top Liner production on PM1.

The Stock Preparation Plant operates with

  • 1 Drum-Pulper for OCC wastepaper raw materials
  • and 1 HC Rotor-Pulper for CLP – Corrugated Loose Papers and Beverage Carton waste

Up to 175 BDMTPD of Rejects form the Drum-Pulper, Sorting Drum (HC-Pulper), Hole Screening run through multiple stages as Metal Separation, Shredding (LION-Shredder) and Screw Compacting (CFX-R Compax) meeting  highest standards possible.

The plant was ordered in 2021, build and assembled from 2022 until 2024, started up in 2024 and runs since then successfully to full satisfaction.

Meri would like to thank the KIVANC-Team and the Meri Employees for their commitment and successful work.

The plant build and assembled in 2023, started up in 2024 and runs since then successfully to full satisfaction.

Meri would like to thank the SAICA-Team and the Meri Employees for their commitment and successful work.